Cobbles and weeds and inspecting the drains

Standard

plus other things

theinfill dolls house blog - Medieval, Tudor, Jacobean 1:12 dolls house – Porch working on the other side - cobbles

Going for a flowing movement of the air-drying clay shapes from front to side

theinfill dolls house blog - Medieval, Tudor, Jacobean 1:12 dolls house – Porch working on the other side - trying some drainage

Bit up market round here, there’s actually a kennel provided for some of the water and unmentionables to drain away. Trying out the under colouring and drain contents before adding the water and connecting to the cobbles, if it still looks usable then

Other things

theinfill dolls house blog - Medieval, Tudor, Jacobean 1:12 dolls house – Porch working on the other side - tiling

Other side now has tiles and still fits to building where it should – hurrah!

But as you can see there is a triangle agape on this side …

theinfill dolls house blog - Medieval, Tudor, Jacobean 1:12 dolls house – Porch working on the other side - walling to be added

Gaping triangle next to the corridor. Both sections might be a sliding piece all in one (?)

and on the other side too.

theinfill dolls house blog - Medieval, Tudor, Jacobean 1:12 dolls house – Porch working on the other side - removable walling needed

A pop in and out section needed here in upper office corner with wiring connections

Ridge tiles and any plant growth on the roof are what is needed next, though.

The roof tiles are Richard Stacey/weathered

Advertisements

Leave a Comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s